This project in Irby involved demolishing two outdated structures, a cold, damp 1970s
kitchen and a tired garage to make way for two new flat-roof extensions that completely
transformed the ground floor of this detached family home.
From the front, the house still looks modest – but step inside, and you’re met with a bright,
expansive open-plan layout that’s perfect for modern living.
We began by demolishing the old kitchen extension and the side garage, both of which
were no longer fit for purpose. In their place, we built two new flat-roof extensions, one to
the rear and one to the side.
The rear corner of the house was completely opened up, allowing the extensions to flow
seamlessly into the original structure. This created a huge open-plan kitchen and day room
at the heart of the home, plus a separate home office, downstairs shower room, and WC.
We also refurbished the hallway and front sitting room, giving the entire ground floor a full
refresh to match the new modern layout.
This build had an added layer of pride for our team, it was for a local architect we’ve
worked with on many past projects across the Wirral. When an architect chooses us to
build their own home, it’s a serious compliment but it also raises the bar in terms of
expectations and attention to detail.
Happily, the project ran smoothly from start to finish. It was a real pleasure to build, and
seeing the space now in full use by the family makes it even more rewarding. We still get
to experience that impact firsthand when meeting the architect to discuss future tenders,
something that rarely happens once a job is done.
The transformation is night and day. From a dated layout with cold, disconnected spaces
to a warm, open, and family-friendly home that offers room to grow for years to come.
It’s a brilliant example of how thoughtful design, quality building, and the right team can
turn an average property into something truly special, even if it doesn’t look like it from the
kerb.
Type:
Location:
Duration:
Scope:
Client Goal:
© All Rights Reserved 2025 by FTFU Construction